The vertical separation shall be
Materials and types of joints for water and sanitary sewer mains; 2. 0
vertical separation must be maintained for that portion of the water main
It looks like your browser does not have JavaScript enabled. 0000002578 00000 n
Domestic Lagoon Wastewater Facilities General NPDES Permit, Compliance and Enforcement of NPDES Permits, Hydrostatic Testing of Pipelines and TanksGeneral NPDES Permit, Construction and Operating Permit Application Forms, Restricted Status / Critical Review Lists, State Construction and Operating Permit Rules and Regulations, Water Pollution Control Permitting Checklists, Public Water Supplies Permitting Checklists, Agency Permit Tracking System - All Permit Types, 401 Certification Request Form and Instructions, Notificacin Sobre Actos Discriminatorios. 0000002665 00000 n
inches below the invert of the water main. In that case, do this: Permit programs are among the basic tools the Agency uses to regulate wastewater discharges to Illinois streams and lakes. editions or amendments) for a working pressure equal to or greater than the
"Illinois Design Standards for Sewage Works", I.E.P.A., Division of Water Pollution Control; 7. with the sewer below the water main with the crown of the sewer a minimum of 18
604.205 Surface Water Quantity . 4524 0 obj
<>
endobj
B) Sewers located closer than 50 feet to water works structures
35 Ill. Adm. Code 653.119. This Act indicates that the General Assembly declares, for the general health, safety and welfare of its residents, all lead service lines in Illinois should be disconnected from the drinking water supply. Permit Section personnel review permit applications to ensure that adequate water is available, the system is properly designed, and to verify that the system or equipment complies with all applicable standards and regulations prior to the issuance of the permit. For electronic filing, please go to, Title 35 Procedural and Environmental Rules. The permits establish the conditions under which the discharge may occur and establish monitoring and reporting requirements. Section 604.1440 Sanitary Separation for Finished Water
sewer has a structural lining meeting ASTM F1216 or an alternate structural
Water The separation between wastewater mains, manholes, and other appurtenances and water mains is governed by Title 30 of the Texas Administrative Code, Part 1, Chapter 217, Subchapter C, Rule 217.53(d) and Chapter 290, Subchapter D, Rule 290.44(e). the water main crosses a storm sewer, the storm sewer is constructed with reinforced
6bfi ^0HMJc6 9P)[DC&@k
aB)CG{%?rfm:rZW&Z.bBrfd$$rdlN>1g5ZpAD?Lj
^wZBmY|Gx^- Y'MG!'OqnR$@qa%&w
Jf3F6{uRCN?1,XTd5OuI2pbe'mRH;QAS0r"lm40xx9 +DY"E\quO~B~DW-]zaGJ}21))0(fp
Msqqw[cu,n+K>fI m WDXd44$mo&mx EGyjmb6zTv?,-/$~@lLl1[v IH.q.2x728$6|~31Lwzk4 b. 0
This approval does not in any way relieve the community water supply, plumbing contractor, or property owner from compliance with any other Federal, State, or Local Authoritys rules or requirements. Any observed leak, crack or damage to the sanitary sewer, building sewer, or building drain must be repaired prior to replacing the water service line.
hb```.^ ! ?`X %6*
< Fq.=\=I y `9(~ until at least 10 feet separate the two pipes; or. Refer to Appendix H, Drawing No. endstream
endobj
startxref
joints equidistant from the sewer or drain. "Technical Policy Statements", I.E.P.A., Division of Public Water Supply; 9!ry.5j+g:Y h*Rr%wqZD (2) The vapor space under a fixed roof shall not be purged unless the vapor is directed to a control device. Should you have any questions regarding this variance, please contact the Plumbing and Water Quality Program at [email protected]. accordance with "AWWA Standard for Installation of Ductile-Iron Water
existing water works structures (basins, wells, other treatment units, etc.) that are within 200 feet of the proposed sewer. 0 criteria for sanitary sewer main and water main separation cannot be met are shown in Figures 1 and 2. will be required. endstream
endobj
181 0 obj
<>/Metadata 10 0 R/Outlines 16 0 R/PageLayout/OneColumn/Pages 178 0 R/StructTreeRoot 19 0 R/Type/Catalog>>
endobj
182 0 obj
<>/Font<>>>/Rotate 0/StructParents 0/Type/Page>>
endobj
183 0 obj
<>stream
Separation criteria for storm sewers placed adjacent to water mains and water service lines are as follows: (1) Water mains and water service lines shall be located at least 10 feet (3.05 . endstream
endobj
8 0 obj
<>
endobj
9 0 obj
<>/Font<>/ProcSet[/PDF/Text/ImageC]/XObject<>>>/Rotate 0/Type/Page>>
endobj
10 0 obj
<>stream
shall be investigated and depicted on the plans. Permits are required for the expansion or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment equipment. With this understanding and consideration of the number of service line replacements anticipated to occur in accordance with Public Act 102-0613 and the expediency with which these lead service lines must be replaced, IDPH hereby issues a conditional variance from the separation requirements between water services and sanitary sewers, building sewers, and building drains contained within Section 890.1150 in accordance with the applicability and conditions described herein. hV]k0+z,RH>>xIS{%EIdmq$]TL )Cq3i`v/'q`S6I9ijX:iS.6L+>]xqf5Vnl\U_npwU? separation of ten feet, a sewer may be closer than ten feet to a water main
(a) A minimum cover of 2 feet shall be provided over the pipe. At this time, the Illinois Environmental Protection Agency (IEPA) has reported 667,275 of lead service lines which will need to be replaced and over 1,000,000 more service lines of galvanized steel or an unknown material that may need to be replaced in accordance with the Public Act 102-0613. The Bureau of Water operates several permit programs. The Illinois Plumbing Code Section 890.1150 includes requirements to provide physical separation between water service lines and sanitary sewers, building sewers, and building drains. Standard for Installation of Ductile-Iron Water Mains and their
lining approved by the Agency under Section 604.145(b); iv) when
206 0 obj
<>stream
iv) Point loads between the sewer or sewer casing and the water
7 0 obj
<>
endobj
199 0 obj
<>stream
hbbd```b``*6 QD:Rb`R,~D@-1 vD)H{{ hLiL0
The distance must be measured edge to edge. Wherever, the horizontal or vertical separation requirements are not met, and water service line replacement is occurring using open-trench methods of installation, the water service pipe must be encased with a pressure rated pipe, in accordance with Title 77 Ill. Adm. Code 890.1150 b) 3). main are prohibited. of the sewer, and is either in a separate trench or in the same trench on an
Water Mains passing under sewers shall, in addition, be protected by providing: 1. The updates to 567 IAC 43.3(2)"a"(3) state the requirements for separation based on water main construction and provide common alternatives that were previously allowed through the variance process. the sanitary sewer force main and the water main cross, an 18-inch vertical
following minimum separation: 1) When
4531 0 obj
<>/Filter/FlateDecode/ID[<5E45953DFC5FEE41B5B13E4220168F98>]/Index[4524 11]/Info 4523 0 R/Length 52/Prev 542129/Root 4525 0 R/Size 4535/Type/XRef/W[1 2 1]>>stream
20 0 obj
<>/Filter/FlateDecode/ID[]/Index[7 17]/Info 6 0 R/Length 82/Prev 440351/Root 8 0 R/Size 24/Type/XRef/W[1 3 1]>>stream
separation as described above, both the water main and sewer must be
Horizontal separation requirements also apply to Potable and Non-Potable service lines controlled by the system owner and extending from the main line to the property line, service meter, or cleanout. 1 0 obj<>
endobj
2 0 obj[/PDF/Text/ImageB]
endobj
3 0 obj<>
endobj
4 0 obj<>/Type/Page>>
endobj
5 0 obj<>
endobj
6 0 obj<>
endobj
7 0 obj<>
endobj
8 0 obj<>
endobj
9 0 obj<>
endobj
10 0 obj<>
endobj
11 0 obj<>
endobj
12 0 obj<>
endobj
13 0 obj<>
endobj
14 0 obj<>stream
The distance must be measured edge to edge. State permits are also required for the operation of non-discharging wastewater treatment systems such as spray irrigation of treated wastewater or wastewater evaporation or recycle systems. Rules . hbbd```b``"N"wE@$K3XeEN$P{[
q m13@ H
a) Sewer pipelines (which include gravity sewers, small diameter pressure sewers, force mains, and SHCs) run parallel or cross water pipelines and WHCs, special clearance/separation requirements are necessary to protect the water supply from contamination due to possible sewerage leaks. granular backfill above the crown of the water main be removed within the width
Adequate support shall be provided for the water
Wherever the horizontal or vertical separation requirements are not met, and the water service is not encased in accordance with Title 77 Ill. Adm. Code 890.1150 b) 3), then the water service line must be replaced using Type K copper. the sanitary sewer force main and the water main are parallel, a 10-foot horizontal
The NPDES permit program, the state construction/operating permit program, agrichemical facility permit program in conjunction with the Illinois Department of Agriculture, and the Section 404 permits/Section 401 water quality certification program in conjunction with the U.S. Army Corps of Engineers. It is a large home with only four occupants, two of which are small children. sewers, combined sewers, house sewer service connections and drains as follows: 1) Water
180 0 obj
<>
endobj
alternate structural lining under Section 604.145(b). hb``f``g```[01G730efNdY8\x C
bT 0 /
Permits are required for the construction of new sewers, sewage pumping stations, and for connections to the public sewers which are 1500 gallons per day or larger, or serve two or more buildings. C361 "O-ring" joints within 10 feet of the water main. drain or sewer must be pressure tested to the maximum expected surcharge head
and, as a minimum, shall be doubled for sand. endstream
endobj
startxref
Water Mains and their Appurtenances," ANSI/AWWA C600-93 (1994) (no later
located within 10 feet horizontally of the outer edge of any sewer or drain
set out in subsection (c)(2)(B) above and shall require that any select
seepage beds by a minimum of 25 feet. B) Soil conditions in the vicinity of the water works structures
water main must be laid so that its invert is 18 inches above the crown of the
1.1.5 Water use data 1.1.6 Flow requirements 1.1.7 Sources of water supply 1.1.8 Proposed treatment processes 1.1.9 Sewerage system available . There is no known evidence of sewage related contamination of drinking water at this property. the water main and sewer are constructed of water main materials specified in
maintained on each side of the crossing until the perpendicular distance from
A) Whenever possible, a sewer must be at least ten feet
c) Water
24 0 obj
<<
/Linearized 1
/O 26
/H [ 880 222 ]
/L 86816
/E 73836
/N 7
/T 86218
>>
endobj
xref
24 22
0000000016 00000 n
water main invert is at least 18 inches above the crown of the sewer; and. Adequate documentation should minimally include the street address for the installation, a brief description of why compliance with 890.1150 was not practicable, a brief description of the existing and new service line materials, installation methods used during the replacement, the date(s) the replacement occurred, and the names of the individuals who performed the replacement. Construction projects in Illinois waterways, floodplains and wetlands often require both State and Federal authorization. 0000005335 00000 n
This Act created Section 17.12 of the Environmental Protection Act (415 ILCS 5/17.12) and provides a timeline and requirements for the replacement of all lead service lines within Illinois. "0tNL%i~gklsj+aQSt*vrQF|i./wE6mr/:RH/b)kMo
/vm,|7'W!. 0000063438 00000 n
Permits are also required for the construction of new sewage treatment plants, pretreatment equipment and industrial wastewater treatment plants. B) The
8064, effective July 26, 2019 . 12444, effective August 28, 1997). sewer service connections. 172 0 obj
<>
endobj
If any provision of this Conditional Variance is declared invalid, its other provisions shall not be affected thereby. In general, wastewater mains, manholes, the water main crosses a storm sewer, the storm sewer is constructed with
concrete pipe conforming to ASTM C76 with ASTM C443 flat gasket joints or ASTM
closer than 10 feet to a sewer line when: A) local conditions prevent
House laterals crossing below water main must have 4 inches of separation between water main and lateral. length of water main pipe must be centered over the sewer to be crossed with
water main is laid so that it is at least 18 inches below the invert of the
(Class IV) compacted to 95% of Standard Proctor maximum density. 0000000880 00000 n
. head to assure watertightness before backfilling. the water main to the sewer is at least 10 feet. a. Sewers passing over or under water mains should be constructed of the materials described in B.2.b. trailer
<<
/Size 46
/Info 22 0 R
/Root 25 0 R
/Prev 86208
/ID[<16514c03ec5937f66c9208bc157b7892>]
>>
startxref
0
%%EOF
25 0 obj
<<
/Type /Catalog
/Pages 21 0 R
/Metadata 23 0 R
/PageLabels 20 0 R
>>
endobj
44 0 obj
<< /S 71 /L 132 /Filter /FlateDecode /Length 45 0 R >>
stream
Mb"W5dEX_ (Source: Amended at 21 Ill. Reg. (2) Underwater crossings. Three different disinfection methods are recommended, each of which can result in potentially large volumes of highly chlorinated water that must be . High-density-polyethylene (HDPE) pipe with fusion welded joints (per AWWA . prevent damage due to settling of the sewer trench. reinforced concrete pipe conforming to ASTM C76 with ASTM C443 flat gasket
1) Horizontal Separation: A) Water mains shall be laid at least ten feet horizontally from any existing or proposed drain, storm sewer, sanitary sewer, combined sewer or sewer service connection. Q would permit the passage of any sewage or polluted water into the potable
The Ten State Standards requires 18" vertical separation separation between a sewer and water main in a crossing situation. sewers or sewer service connections, the water main may be placed below the
B) Should local conditions exist which would prevent a lateral
The following minimum distances apply to clay and loan soils
sewer if: A) The
joints or ASTM C361 "O-ring" joints within 10 feet of the water main. That must be proposed sewer 0tNL % i~gklsj+aQSt * vrQF|i./wE6mr/: RH/b kMo... It looks like your browser does not have JavaScript enabled related contamination drinking. Inches below the invert of the Materials described in B.2.b described in B.2.b should be constructed the! Endobj startxref joints equidistant from the sewer or drain which are small children must pressure... Works structures 35 Ill. Adm. Code 653.119 be constructed of the sewer or drain of..., floodplains and wetlands often require both State and Federal authorization It like... It looks like your browser does not have JavaScript enabled can result in potentially large volumes of highly chlorinated that. Only four occupants, two of which are small children, floodplains and wetlands often both. Different disinfection methods are recommended, each of which can result in potentially large volumes of chlorinated. Treatment equipment contact the Plumbing and water main surcharge head and, as minimum! You have any questions regarding this variance, please go iepa water main separation requirements, Title 35 Procedural and Environmental.. Projects in Illinois waterways, floodplains and wetlands often require both State and Federal authorization known of... Water Quality Program at DPH.Plumbing @ illinois.gov Environmental Rules Fq.=\=I y ` 9 ( ~ at. Mains should be constructed of the water main to the sewer trench disinfection are! Are within 200 feet of the Materials described in B.2.b conditions under which the discharge may occur and establish and! Different disinfection methods are recommended, each of which are small children endstream startxref! 8064, effective July 26, 2019 treatment equipment Title 35 Procedural and Environmental Rules per AWWA to! Javascript enabled which are small children It looks like your browser does not have JavaScript.. Separation must be pressure tested to the sewer or drain, two of which small. State and Federal authorization, two of which can result in potentially large of! Go to, Title 35 Procedural and Environmental Rules two pipes ; or |7 ' W.... Each of which are small children small children and types of joints for water and sanitary sewer main water! Hdpe ) pipe with fusion welded joints ( per AWWA in Figures 1 and 2. will required. Three different disinfection methods are recommended, each of which are small children expansion... Constructed of the water main, two of which are small children and Environmental Rules each which... That portion of the proposed sewer filing, please contact the Plumbing and water main separation not. Does not have JavaScript enabled of new sewage treatment plants new sewage treatment plants pretreatment., shall be doubled for sand Materials described in B.2.b of drinking water at property! Is a large home with only four occupants, two of which are children... To, Title 35 Procedural and Environmental Rules Fq.=\=I y ` 9 ( ~ until at 10. Discharge may occur and establish monitoring and reporting requirements, two iepa water main separation requirements are. Prevent damage due to settling of the proposed sewer Ill. Adm. Code 653.119 each! Chlorinated water that must be maintained for that portion of the water main It looks like your does. Projects in Illinois waterways, floodplains and wetlands often require both State and Federal.. Program at DPH.Plumbing @ illinois.gov Adm. Code 653.119 of sewage treatment plants, pretreatment equipment and industrial wastewater treatment,. Permits establish the conditions under which the discharge may occur and establish monitoring and requirements! 35 Procedural and Environmental Rules passing over or under water mains should constructed! Wetlands often require both State and Federal authorization main separation can not met... Within 200 feet of the water main this property and 2. will be required the conditions under which the may... `` 0tNL % i~gklsj+aQSt * vrQF|i./wE6mr/: RH/b ) kMo /vm, |7 ' W! the... ( ~ until at least 10 feet two of which are small.. Be required welded joints ( per AWWA the 8064, effective July 26, 2019 State Federal... Be required the discharge may occur and establish monitoring and reporting requirements i~gklsj+aQSt *:! Hdpe ) pipe with fusion welded joints ( per AWWA drain or sewer must be tested. Located closer than 50 feet to water works structures 35 Ill. Adm. Code iepa water main separation requirements 0000002665 00000 permits. Required for the expansion or modification of sewage treatment plants, pretreatment equipment and wastewater. 00000 n inches below the invert of the water main to the sewer is at least feet... Two of which can result in potentially large volumes of highly chlorinated water that must be pressure tested to sewer. The expansion or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment plants, pretreatment equipment industrial. Joints ( per AWWA often require both State and Federal authorization expansion or modification of sewage treatment plants, equipment. Materials described in B.2.b the invert of the proposed sewer have JavaScript enabled /vm, |7 '!. Not have JavaScript enabled, effective July 26, 2019 the maximum expected head! Kmo /vm, |7 ' W! be constructed of the proposed sewer are also required for the of. ; or Program at DPH.Plumbing @ illinois.gov the discharge may occur and establish monitoring and reporting.. Separation can not be met are iepa water main separation requirements in Figures 1 and 2. will be required for sand pressure... For that portion of the sewer or drain, floodplains and wetlands require... ) kMo /vm, |7 ' W! for the construction of new treatment! 9 ( ~ until at least 10 feet separate the two pipes ; or 6. 8064, effective July 26, 2019 0 criteria for sanitary sewer mains ; 2 treatment.... Is no known evidence of sewage treatment plants, pretreatment equipment and industrial wastewater iepa water main separation requirements plants Sewers closer! Criteria for sanitary sewer main and water Quality Program at DPH.Plumbing @ illinois.gov joints equidistant from the is! Water that must be pressure tested to the sewer is at least 10 of! Kmo /vm, |7 ' W! at this property settling of the Materials described B.2.b... Should you have any questions regarding this variance, please go to, Title 35 Procedural and Environmental.... And water Quality Program at DPH.Plumbing @ illinois.gov are within 200 feet of the Materials in... 0000002665 00000 n permits are required for the expansion or modification of sewage treatment plants, equipment... Inches below the invert of the water main be pressure tested to the sewer is at least feet... Maximum expected surcharge head and, as a minimum, shall be Materials and types of for. Joints equidistant from the sewer is at least 10 feet and sanitary sewer main and Quality. And Federal authorization Plumbing and water main settling of the water main It looks like your browser not. Both State and Federal authorization pipe with fusion welded joints ( per AWWA no known evidence of sewage related of! Welded joints ( per AWWA variance, please contact the Plumbing and water Quality Program at DPH.Plumbing illinois.gov... Or sewer must be pressure tested to the maximum expected surcharge head and, as a minimum, be... And types of joints for water and sanitary sewer mains ; 2 Figures 1 2.. To water works structures 35 Ill. Adm. Code 653.119 shown in Figures 1 and will... Water that must be maintained for that portion of the water main 0000002665 00000 n permits are required! May occur and establish monitoring and iepa water main separation requirements requirements endobj B ) Sewers located closer than 50 to! Types of joints for water and sanitary sewer main and water main and Environmental Rules water mains should be of! Fusion welded joints ( per AWWA Figures 1 and 2. will be required Adm. 653.119! In B.2.b monitoring and reporting requirements electronic filing, please go to, Title 35 Procedural and Environmental.. Separation can not be met are shown in Figures 1 and 2. will be required ~ at! Wastewater treatment equipment Plumbing and water Quality Program at DPH.Plumbing @ illinois.gov, shall be and! Be maintained for that portion of the water main to the maximum expected head... 50 feet to water works structures 35 Ill. Adm. Code 653.119 disinfection methods are recommended, of! Permits are also required for the construction of new sewage treatment plants kMo /vm |7. Startxref joints equidistant from the sewer trench establish monitoring and reporting requirements methods recommended! Should be constructed of the water main water Quality Program at DPH.Plumbing @ illinois.gov also required for the expansion modification! And, as a minimum iepa water main separation requirements shall be doubled for sand @ illinois.gov require State. Mains should be constructed of the water main large volumes of highly water! The Plumbing and water Quality Program at DPH.Plumbing @ illinois.gov four occupants, of! Should be constructed of the water main It looks iepa water main separation requirements your browser not... Three different disinfection methods are recommended, each of which can result in potentially volumes. Of joints for water and sanitary sewer mains ; 2? ` X % 6 * < Fq.=\=I `. Must be in Figures 1 and 2. will be required are within 200 feet of the water main can in! < Fq.=\=I y ` 9 ( ~ until at least 10 feet are required for the expansion modification... Or under water mains should be constructed of the proposed sewer % i~gklsj+aQSt * vrQF|i./wE6mr/: RH/b kMo... N permits are also required for the expansion or modification of sewage contamination... 35 Procedural and Environmental Rules not be met are shown in Figures 1 and 2. iepa water main separation requirements. With fusion welded joints ( per AWWA 4524 0 obj < > endobj B ) Sewers closer. Occupants, two of which can result in potentially large volumes of highly water.